Regulatory Challenges and Opportunities for HVDC Projects in the UK

2mins

The United Kingdom stands at a critical juncture in developing its energy transmission infra...

The United Kingdom stands at a critical juncture in developing its energy transmission infrastructure, with High Voltage Direct Current (HVDC) projects playing an increasingly vital role in meeting decarbonisation targets and ensuring energy security. While these projects offer significant benefits, they face a complex regulatory landscape that presents both substantial challenges and promising opportunities.


Key Regulatory Challenges

Complex Approval Processes

One of the most significant hurdles for HVDC projects in the UK is navigating the multi-layered approval framework. Major transmission projects typically require Development Consent Orders (DCOs), marine licences, environmental permits, and various other regulatory clearances before construction can begin. This process often involves extensive consultation with numerous stakeholders, including local communities, environmental bodies, and various government agencies.

These approval processes can extend project timelines considerably, with regulatory decisions sometimes taking years to finalise. For interconnector projects that cross international boundaries, this complexity multiplies as developers must simultaneously navigate different regulatory regimes in each connected country.


The "Cap and Floor" Regime

Ofgem's cap and floor regulatory framework, which governs UK interconnector projects, represents another significant challenge. This mechanism sets maximum and minimum levels of revenue that developers can earn, providing some certainty but potentially limiting upside returns for investors.


While the cap and floor approach offers some revenue security, it creates complications for project financing. The final revenue determination typically occurs only after a project becomes operational, creating uncertainty during the development phase. This can make HVDC projects less attractive for traditional project finance models, as lenders may be hesitant to provide capital without clear revenue projections.


Supply Chain Constraints

The specialised nature of HVDC technology creates significant supply chain challenges. Key components such as converters and cables are manufactured by only a handful of global suppliers, creating potential bottlenecks and limiting competition. The recent surge in HVDC projects worldwide has exacerbated these issues, with suppliers increasingly able to dictate terms and timelines.


Between 2023 and 2024 alone, two major framework agreements—TenneT's £25 billion and National Grid's £59 billion—have dramatically increased competition for limited manufacturing slots and skilled personnel. This supply-demand imbalance has driven up costs and reduced supplier appetite for projects perceived as higher risk.


Cross-Border Coordination

For interconnector projects linking the UK with other countries, coordinating regulatory requirements across different jurisdictions presents unique challenges. Each country may have distinct technical specifications, environmental standards, and planning requirements that must be reconciled.


Brexit has added another layer of complexity to this coordination, as previous regulatory alignment with EU countries can no longer be taken for granted. While established mechanisms for cross-border coordination remain, evolving regulatory frameworks on both sides of the Channel require careful navigation.


Promising Opportunities

Despite these challenges, several developments in the UK regulatory landscape offer significant opportunities for HVDC projects.


Accelerated Strategic Transmission Investment (ASTI)

The introduction of Ofgem's Accelerated Strategic Transmission Investment (ASTI) framework represents a major opportunity for expediting critical HVDC projects. This mechanism allows for early funding and streamlined approval processes for transmission infrastructure deemed strategically important for achieving net zero goals.


While Window 3 interconnector projects don't automatically qualify for ASTI treatment, there is potential for certain strategically important projects to benefit from similar acceleration measures in the future, particularly as the UK works to strengthen its energy security.


Innovation Through Competitive Tenders

Ofgem's approach to transmission procurement increasingly encourages innovation and efficiency through competitive tender processes. This creates opportunities for developers to propose alternative technical solutions and novel commercial arrangements that could overcome traditional barriers.


Recent tender decisions have demonstrated Ofgem's willingness to approve innovative projects that offer clear consumer benefits. For example, the approval of Offshore Hybrid Assets (OHAs) like LionLink (to the Netherlands) and Nautilus (to Belgium) shows regulatory openness to multifunctional infrastructure that combines interconnection with offshore wind connections.


Growing Policy Support for Interconnection

The UK government's Energy Security Strategy and subsequent policy developments have strongly emphasised the importance of interconnection for achieving energy security and decarbonisation goals. This policy backing creates a favourable environment for developing new HVDC projects, with potential for supportive regulatory treatment.


Furthermore, the UK's climate commitments, including legally binding net zero targets, provide long-term policy certainty that can help offset shorter-term regulatory risks. As interconnectors enable greater integration of renewable energy, they align perfectly with these policy objectives.


Emerging Hybrid Models

The regulatory framework is evolving to accommodate hybrid or multi-purpose interconnector models. These innovative approaches combine traditional interconnection with offshore wind export capabilities, maximising infrastructure efficiency. Ofgem's willingness to grant "cap and floor in principle" to Offshore Hybrid Assets demonstrates regulatory support for these models.


Projects like LionLink and Nautilus are pioneering this approach in UK waters, potentially setting precedents for regulatory treatment of similar hybrid projects in the future. As these models mature, they may offer more attractive risk-return profiles for investors while delivering greater system benefits.


The Path Forward

Successfully navigating the UK's regulatory landscape for HVDC projects requires several strategic approaches:


Early Stakeholder Engagement

Engaging early with regulators, supply chain partners, and other key stakeholders can help identify and address potential issues before they become roadblocks. This collaborative approach can streamline approval processes and build support for projects.


Balanced Risk Allocation

Developing procurement strategies that equitably distribute risks between developers and suppliers is essential in the current market environment. Suppliers increasingly favour projects with reasonable risk profiles and realistic timelines, making thoughtful contract structuring a competitive advantage.


Knowledge Sharing and Standardisation

Creating mechanisms for knowledge sharing across projects can significantly improve efficiency. Standardising certain aspects of design and procurement, while still allowing for innovation, can reduce costs and accelerate delivery timelines.


International Coordination

For interconnector projects, establishing robust coordination mechanisms with international partners early in the development process is crucial. Aligning technical standards and regulatory approaches across borders can prevent costly delays and redesigns.


Conclusion

While regulatory challenges for HVDC projects in the UK are substantial, the opportunities presented by evolving frameworks, growing policy support, and innovative business models create a promising environment for future development. As the UK continues its energy transition, HVDC infrastructure will play an increasingly vital role in ensuring system stability, enabling renewable integration, and maintaining energy security.


The regulatory landscape will likely continue to evolve, potentially offering more streamlined pathways for strategically important projects. Developers who can successfully navigate this complex environment while delivering consumer and system benefits will be well-positioned to contribute to the UK's energy future through transformative HVDC projects.